4. Sixth form block

The existing overhead canopy has been problematic in terms of drainage & staining,

6th Form

 

One possibility would be to use stained timber pergolas, matching those around THE PERIMITER PATH.

6th form Pergola- LR

Sketch impression

By using posts at roughly 2.1M Centres, we can partially shelter a much larger area than before.

Back to Slated Row

1 response on 4. Sixth form block

  1. We think that the best option would be to extend 6th form to have a dedicated new kitchen which would include washing machine so that we can use this for independent living skills as well as cooking activities.

    We also would like a dedicated entrance area that would contain lockers, coat hooks, toilets and Moulton overalls and shoes. This would mean that lockers could be attached properly to the walls and students could put their belongings away before entering g tutor groups.

    The 6th form is sometimes cold as the heating is inadequate for the building.

    The concertina wall needs to be replaced by a permanent wall.

    We feel that although a pagoda style covering would be pleasant it maybe a waste of money if other changes are completed in Stage 2 of the development.

    T3 Tutor Group

Leave a Reply